1/3
Project Description:
The new 12-story O’Quinn Medical Tower at Baylor St. Luke’s – McNair Campus will be the new clinical home for the Dan L Duncan Comprehensive Cancer Center. The Center is nationally ranked for cancer Care by U.S. News & World Report and is one of only three National Cancer Institute-designated Comprehensive Cancer Centers in Texas, a designation it earned through Baylor College of Medicine. The scope of work in this main ACC1 Tower includes design and construction from the ground up including Demolition, Infrastructure, Tower and Podium Structure and Elevated Structure, Tower and Podium Skins, Core and Shell and Testing and Inspections. The building will be connected to a new eight-story parking garage and includes new equipment, an advanced chilled water system and special features. The scope of work includes the installation of a new chilled water system “TECO Service” to service the tower, in addition to external site work and Turn-in lane improvements along the Old Spanish Trail.
Location: Houston, TX
Main Contractor: Harvey Builders.
Organization: HSE Contractor INC.
Position: Planning and CPM scheduling Consultant.
Roles and Responsibilities:
Project description:
Major components of Project Work consist of: Demolition, fire sprinklers, fire alarms, doors, plumbing, HVAC, fixtures, toilets, beds, concrete, electrical raceway, wiring, cable and related work.
Total project costs are estimated at $22,728,000
Project Location: Patton, San Bernardino County, California
Contractor: Two Brothers Construction Corp.
Organization: HSE Contractors INC.
Position: Planning and CPM scheduling Consultant.
Role and Responsibilities:
1/3
Location: RICHMOND, VIRGINIA
Owner: U.S. Department of Veterans Affairs.
Contractor: Talon Construction
Organization: HSE Contractor INC.
Position: Planning and CPM scheduling consultant.
Roles and Responsibilities:
1/2
Location: Westborough- Massachusetts.
Owner: Westborough State Hospital
Main contractor: ATLANTIC- coast Dismantling.
Organization: HSE Contractor INC.
Position: Planning and CPM scheduling Consultant.
Roles and Responsibilities:
Location: Brooklyn, New York.
Owner: Ingersoll Hall- Brooklyn College.
Main Contractor: C&L Contracting Group
Organization: HSE Contractor INC.
Position: Planning and CPM scheduling Consultant.
Roles and Responsibilities:
1/4
Project Description:
The laboratory was designed to support and develop multi-modal multi-scale connectome and cell-type maps of the mammalian brain using advanced tracing, imaging, and computational methods. The cross-disciplinary group of researchers develops neuroanatomic and neuroinformatic approaches to understanding connectivity patterns in both health and disease.
The renovation of the existing teaching laboratory, a space that has remained largely untouched from the original CHS construction, required extensive upgrades to the infrastructure to service the needs of the proposed research. The glass partition along the main circulation hallway is intended to be used as whiteboards, which is meant to encourage cross-disciplinary group interaction, as well as allow natural light into the open office area of the lab.
The project includes a large open laboratory space and/or brain brain-clearing alcove for the preparation of slides for the imaging of mouse brains. Additional lab support areas for animal use include a Behavioral Room and a large Surgery Room. The project also dedicates significant spaces for Microscope Rooms for imaging and office/work areas for computational image analysis.
Owner: UCLA Facilities Management
Location: UCLA Campus, California.
Organization: HSE Contractor INC.
Position: Planning and CPM scheduling Consultant.
Roles and Responsibilities:
Copyright © 2024 Home & Business - All Rights Reserved.
USA, Philadelphia : (C) +17327048442
Egypt, Cairo : (C) +201024652149
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.